GENERAL GUIDELINES TO THE APPLICANT FOR AVAILING HT POWER SUPPLY
FOR INDUSTRIES AT 11 KV AND UPTO A LOAD OF 1000 KVA
1. The
applicants are required to furnish the following documents:
- Clearance from SWA/HLC
/NOC or License from local body as the case may be.
- Site plan of the
premises.(Please mark the space for the proposed location of HT metering cubicle)
2. Pay
Rs. 250/- as registration fees at the cash counter of the division office and produce the
receipt while registration.
3. The
spot, for which you desire power supply, will be inspected by the Asst. Exe. Engineer
(Elecl) of the concerned O&M sub division in the presence of the applicant to locate
the position of the metering cubicle and to prepare the estimate.
The
following deposits are to be paid by applicant on being intimated:
- Initial security
deposit.
- Meter security deposit.
- Infrastructure charges.
ISD
HT-2(a)
(Industrial)
Rs.2460/- per KVA upto
500KVA
Rs.2640/- per KVA from
501 to 1000KVA
MSD
HT
cubicle Rs.55240/-
(These
rates are subjected to change from time to time)
4.
Present completion cum test report from a Licensed Electrical Contractor approved by the
Govt. of Karnataka along with wiring diagram in duplicate along with machinery and
transformer details.
5. The
agreement is to be executed in TRIPLICATE with original embossed/stamp paper for Rs. 50/-
duly signed on all pages.
6.
Observe all the conditions as per the power sanction intimation within 90 days from the
date of sanction.
7. The
prospective customers are to pay the infrastructure charges towards H T line extension ,
RMUs, etc., at the rates as mentioned below:
The
entire works as estimated will have to be carried out by the customer at his cost under
self execution basis through class-1 LEC and the financial liability is limited to the
above rates. The extra expenditure incurred (based on inventory) will be reimbursed by the
KPTCL through adjustment in future electricity bills.
If the
cost of works is less than the above calculated amount, then the difference amount will
have to be paid to the corporation.
8. The following
documents has to be presented:
a)
Proof of purchase of all materials used in executing the line work, like Bills/ Invoices.
- b)Test certificates of
the transformer and switchgear etc.,
9.
Provide capacitors of appropriate capacity to maintain the power factor of the
installation above 0.85 in every billing period to avoid power factor penalty.
10.
The capacity of any individual machine shall not be more than the contract demand.
11.
The required electrical Inspectrate certificate as per rule 63(3) of IE Rules 1956 is to
be furnished by applicant for commissioning the transformer & equipments before
availing service.
NOTE:
The HT supply can be availed upto minimum contact demand of 25KVA.
12.
Tariff charges:
HT 2
(a) Industrial
(a)
Demand charges -
-
Rs.150/- per KVA per month of billing demand.
PLUS
(b)
Energy charges -
(i)
Rs. 3.10 pu upto one lakh units.
(ii)
Rs.3.40 pu between 1 to 2 lakhs.
(iii)
Rs.3.55 pu above 2 lakhs units.