Preamble
 
Planning for Future
 
Load Projections
 
Measures
 
Review
 

IPP Policy   -   Planning for Future

line.gif (80 bytes)

  1. The State has experienced a power shortage situation for twenty years and is known as a State of power shortage. It is necessary to clear this impression by ensuring adequate power in the years to come firstly to provide a sense of confidence to the prospective entrepreneurs and secondly to attract those industries who are having captive plants to opt again for grid supply.

  2. Power system planning is contemplated for a ten year period to achieve the following
    (1) Projection of demand and energy requirements for a period of ten years.
    (2) Generation planning for a period of decade to meet the projected load growths on least cost options taking into consideration capital investment on evacuation lines and transmission losses.
    (3) To develop an optimal power system to meet the forcasted power demand in various horizon years and
    (4) To arrange reliable and quality power supply to all the consumers i.e., uniterrupted, reliable and stable power supply at rated voltages and frequencies;

    by taking certain measures such as improvements in stability of the system and reduction of system T&D losses to an optimal level, consistent with load pattern and density.