APPLICATION REGISTRATION cum processing FEE
The
application registration cum processing fees payable by the applicant for registration
purpose is as follows.
Sl.
No. |
Category |
Amount
Rs. |
01. |
Domestic / Non-Commercial
Lighting. Section 5.00 |
25.00 |
02. |
Domestic combined lighting
& heating (AEH) /Non-Commercial / Non-Domestic combined lighting & heating.
Section 5.00 |
50.00 |
03. |
Commercial Lighting. Section
5.00 |
50.00 |
04. |
I.P. Sets. Section 6.00 |
50.00 |
05. |
L.T. Power. Section 7.00 |
100.00 |
06. |
H.T.Power. Section 8.00 |
250.00 |
07. |
Commercial / Residential complexes / M.S.Buildings. Section 9.00 |
As prescribed for each installation of that category as above
subject to minimum of Rs.250.00per premises |
08 |
Layouts. Section 10.00 |
250.00 per layout |
09 |
Public Lighting. Section 11.00 |
25.00 |
10. |
Application for reduction of
sanctioned load / contract demand. Section 34.02. |
As applicable to respective category of power supply as noted
above. |
Note:
The above fee shall also be applicable for reregistration of application for power
supply.
ESTIMATED POWER CONSUMPTION CHARGES / INITIAL SECURITY DEPOSIT (ISD)
All
prospective Consumers, shall pay unless exempted security towards estimated power
consumption charges to cover three months (3MMD) power supply bills worked out on basis of
the estimated consumption as per the table given below or the three months line minimum
charges whichever is higher.
The
estimated power supply charges shall include fixed charges, if any, for LT installations
and demand charges on 100% contract demand for HT and E.H.T.installations. The fixed
charges shall be as per Tariff schedule in force from time to time.
LT INSTALLATION |
Type of installation |
Estimated consumption per
month |
a) Domestic / Non-Domestic, Non
Commercial lighting |
10 Units for every 250 watts or
part thereof of sanctioned load. |
| b) Non-commercial combined lighting, heating and power |
100 units per KW or part
thereof of sanctioned load. |
c) Commercial Lighting |
20 units for every 250 watts or
part thereof of sanctioned load. |
| d) Commercial heating and/or Motive power |
135 units for every KW or part
thereof of sanctioned load. |
e) Irrigation Pump sets |
Yearly minimum charges as per
Tariff in force from time to time. |
f) Public lighting |
As per prevailing Tariff |
g) Others |
135 units per KW or part
thereof sanctioned load per shift. |
| |
HT INSTALLATION |
Type of installation |
Estimated consumption per month |
h) All HT installations |
100 units per KVA of contract
demand. |
Note:
The following types of installations are exempted from payment of ISD:
- Water supply &
Sewerage installations of Village Panchayats and Town Municipalities.
- Public lamp
installations of Village Panchayats and town Municipalities.
ADDITIONAL
SECURITY DEPOSIT (ASD)
After
the installation is serviced, if the deposit held falls short of three times the average
monthly bill amount of the preceding calendar year, the difference shall become payable by
the Consumer as additional security deposit, within 30 days from the date of demand
notice.
Note:
The bill amount for the above purpose shall exclude taxes, arrears, audit short claims,
interest, back billing charges, penal charges for excess consumption / demand.
METER
SECURITY DEPOSIT (MSD)
Meter
security deposit is payable towards the meter / metering equipment at the rates as per
schedule of rates prescribed by the Licensee from time to time by Consumers of all LT and
HT installations except:
a) All
domestic lighting & Non-commercial lighting installations.
b) All
commercial lighting installations whose sanctioned load is 1 KW and less.
APPLICABLE
TO ALL SECURITY DEPOSITS
a)The
amount payable shall be rounded off to the next multiple of Rs. 10/-
b)
Security deposit (ISD and ASD) and MSD will be refunded by the Licensee on termination of
the contract by either party after adjustment of dues, if any.
c) The
security deposit will not earn any interest.
d) In
case the ASD is not paid within the stipulated period, the installation is liable for
disconnection by a 7 days notice.
COST
TOWARDS SERVICE LINE FROM LT APPLICANTS(Applicable for Section 5.00 & 7.00)
i) |
Upto and inclusive of 3
KW(4HP) |
NIL |
ii) |
Above 3 KW and upto and
inclusive of 15KW |
Rs.500/- per KW for the loads
above 3 KW |
iii) |
Above 15KW and upto and
inclusive of 25KW |
Rs.6000/- plus Rs.1000/- for
loads above 15KW. |
iv) |
Above 25KW |
Rs.16,000/- Plus Rs.1500/- per
KW for loads above 25KW. |
In addition to the above charges, an additional amount of Rs.1000/- per KW
for the loads above 3 KW shall be collected in Bangalore (Corporation, B.D.A., B.M.R.D.A.)
area towards HT / LT U.G. cable system.
Note:
In case of existing buildings, industries, wherever additional loads are to be
serviced, the cost towards service line shall be collected for additional load only at the
appropriate slab rate taking into consideration the existing loads also. However, the
additional cost towards service line of Rs.1000/ per KW applicable for Bangalore urban
area need not be collected in case of existing buildings.
COSTS
TOWARDS SERVICE LINE FROM LT APPLICANTS:
(Applicable
for Section 9.00)
Service
line charges shall be collected based on specified load for loads above 25 KW.
For
specified loads below 25 KW, Service line charges shall be collected based on
requisitioned load
i) |
Upto and inclusive of 3 KW. |
NIL |
ii) |
Above 3 KW and upto and
inclusive of 15KW |
Rs.500/- per KW for the loads
above 3 KW |
iii) |
Above 15KW and upto and
inclusive of 25KW |
Rs.6000/- plus Rs.1000/- for
loads above 15KW. |
iv) |
Above 25KW and upto and
inclusive of 50KW |
Rs.16,000/- Plus Rs.5000/- per
KW for loads above 25KW. |
v) |
Above 50KW and upto and
inclusive of 100KW |
Rs.1.41,000/- Plus Rs.15000/-
per KW for loads above 50KW in Bangalore BMRDA & Rs.10,000/- per KW in other places |
In addition to the above charges, an additional amount of Rs.1000/- per KW
for the loads above 3 KW shall be collected in Bangalore (Corporation, B.D.A., B.M.R.D.A.)
Area towards HT / LT U.G. cable system.
COSTS
TOWARDS SERVICE LINE FOR ARRANGING POWER SUPPLY TO LAYOUT (Applicable for Section 10.00)
(Cases
where the Developers / Promoters have abandoned the execution or have abstained from
executing the work.)
(i)
For sites coming in the areas of Bangalore Mahanagarapalike, B.D.A. and its agglomeration
area, Rs.4,000/- per KW of applied load subject to a minimum of Rs.12,000/- per site.
(ii)
For sites coming in the areas of city corporation and its agglomeration area of Mysore,
Mangalore, Hubli, Gulbarga and Belgaum.
(a)
For sites having areas of 1200 sq.ft & less, ie, (30ft x 40ft), Rs.4,000/- per KW of
applied load per site subject to a minimum of Rs.4,000/- per site.
(b)
For sites having areas of more than 1200 Sq.ft. Rs.4,000/- per KW of applied load subject
to a minimum of Rs.12,000/- per site.
(iii)
For sites coming in other urban areas within the Town limits identified by local /
development authority, Rs.4,000/- per KW of applied load per site subject to a minimum of
Rs.4,000/- per site. `
(iv)
For sites coming beyond the Town limits in the layouts other than referred in Section10.04
(i), (ii), & (iii), Rs.3,000/- per KW of applied load per site subject to a minimum of
Rs.3, 000/- per site.
SUPERVISION
CHARGES - Nil as the same is adjusted towards refund of service main work as per
Section 4.08 (iv)
RECONNECTION
CHARGES per Installation
| a) |
Single phase Domestic lighting Consumers. |
Rs.20/= |
| b) |
Single phase-Other Consumers including AEH both S.Ph / 3 Ph. |
Rs.50/= |
| c) |
All Consumers other than AEH connected with 3 Phase supply |
Rs.100/= |
| d) |
All HT & EHT installations |
Rs.500/= |
Note:
If the monthly bill is less than Rs100/=, RECONNECTION Fee shall be Rs. 5/= only.
TRANSFER
OF INSTALLATION
| a) |
All L.T. installations |
Rs.100/=per Installation |
| b) |
H.T. installation |
Rs.500/= per Installation |
SERVICE
CHARGES FOR ISSUE OF N.O.C. WHILE ARRANGING POWER SUPPLY TO BUILDINGS UNDER SECTION 9.00 /
LAYOUTS UNDER SECTION 10.00
| a) |
For each Building UNDER SECTION 9.00 |
Rs.10, 000/=per building |
| b) |
For layouts formed by private parties / societies etc. UNDER
SECTION 10.00 |
Rs.200/=per site or
Rs.10,
000/=per layout whichever is higher. |
CHARGES FOR INSPECTION / TESTING OF INSTALLATION
a) |
Inspection / Testing for
servicing a new installation
(or
for extension or alternation) |
For the First Test No CHARGE |
| b) |
Subsequent Inspection / testing
warranted due to absence of contractor or his representative or due to defects in wiring
of Consumers premises:
i)
Domestic/Non-Commercial Lighting / Non-Commercial combined lighting & heating (AEH) /
Commercial lighting installation / IP installation and Other LT installations
ii) HT
installations |
Rs.100.00
Rs.200.00 |
c) |
Charges for service necessitated due to conversion of an
installation or additions and/or alternations to an installation i) LT
ii) HT |
Rs.100.00
Rs.200.00 |
d) |
Charges for temporary disconnection at Consumers request |
Rs. 50.00 |
TESTING OF METERS
For
testing of meter at the instance of the Consumer
(Either
belonging to the Licensee or to the Consumer)
| a) Domestic/Non-Commercial Lighting / Non-Commercial combined
lighting & heating (AEH) / Commercial lighting installations |
Rs. 100.00 |
b) Any Other LT installations |
Rs.200.00 |
| c) All HT installations |
Rs.500.00 |
RATING
/ RE-RATING OF INSTALLATION
For
rating / re-rating of installation at the instance of the Consumer
a) All LT installations |
Rs.250.00 |
| b) All HT installations |
Rs.500.00 |
FURNISHING CERTIFIED COPIES
(To
be issued to the Consumer only)
| a) |
Contractors
completion-cum-test report |
Rs. 20.00 |
| b) |
Ledger Extract |
Rs.20.00per Calendar year or
part thereof |
| c) |
Agreement |
Rs.20.00 |
| d) |
Details of Security Deposits
held |
Rs.50.00 |
| e) |
Estimate |
Rs.50.00 |
| f) |
Any other correspondence
relating to LT/HT installation |
Rs.20.00 per sheet |
PUBLIC LAMPS AND FITTINGS
Replacement
of lamps will be carried out by the Licensee on payment of fixed labour charges, as
detailed below for each lamp.
| a) Incandescent lamp |
Free |
| b) Fluorescent lamp |
Rs.15.00 |
| c) Mercury vapor lamp |
Rs.20.00 |
| d) Sodium vapor lamp Note:
1) The
charges indicated above do not include the cost of lamps. The local body shall supply the
lamp.
2) In
case of replacement of faulty chokes, starters, fittings, accessories etc., payment shall
be made as per separate estimate prepared under "Deposit Contribution Works" |
Rs.35.00 |
Charges for non-realisation of cheque is as noted below
(Cheque
dishonour fee)
1 |
Cheque amount Upto Rs. 10,000/- |
5% of amount subject to minimum of Rs. 100/- |
2 |
Cheque amount of Rs.10, 001 and
upto
Rs.1,
00,000/- |
3% of amount subject to minimum of Rs. 500/- |
3 |
Cheque amount Above
Rs.1,00,000/- |
2% of amount subject to minimum of Rs. 3000/- |
SHIFTING OF METER BOARD / METERING CUBICLE AT THE REQUEST OF THE CONSUMER
a) LT single phase supply |
Rs.100.00 |
| b) LT three phase supply |
Rs.200.00 |
c) HT Supply |
Rs.500.00 |
Note: The actual work shall be got carried out by the Consumer at his cost
through the LEC after obtaining necessary line clear from the Licensee.
MISCELLANEOUS
WORKS
The
charges payable in advance for any work, which the Licensee may undertake for the Consumer
and which is not included in the above schedule, shall be the cost of materials and labour
plus 10% of the cost of estimate excluding the employees cost as overhead charges. Copy of
the estimate shall be furnished on demand on payment of charges as per Section 30.16 (e). |