ELECTRIC SUPPLY AND DISTRIBUTION CODE


 
 
line.gif (861 bytes)
SCHEDULE OF SECURITY DEPOSITS, COST TOWARDS SERVICE LINE, AND OTHER SERVICE CHARGES
 

APPLICATION REGISTRATION cum processing FEE

The application registration cum processing fees payable by the applicant for registration purpose is as follows.

Sl.

No.

Category

Amount

Rs.

01.

Domestic / Non-Commercial Lighting. Section 5.00

25.00

02.

Domestic combined lighting & heating (AEH) /Non-Commercial / Non-Domestic combined lighting & heating. Section 5.00

50.00

03.

Commercial Lighting. Section 5.00

50.00

04.

I.P. Sets. Section 6.00

50.00

05.

L.T. Power. Section 7.00

100.00

06.

H.T.Power. Section 8.00

250.00

07.

Commercial / Residential complexes / M.S.Buildings. Section 9.00 As prescribed for each installation of that category as above subject to minimum of Rs.250.00per premises

08

Layouts. Section 10.00

250.00 per layout

09

Public Lighting. Section 11.00

25.00

10.

Application for reduction of sanctioned load / contract demand. Section 34.02.

As applicable to respective category of power supply as noted above.

 

Note: The above fee shall also be applicable for reregistration of application for power supply.

ESTIMATED POWER CONSUMPTION CHARGES / INITIAL SECURITY DEPOSIT (ISD)

All prospective Consumers, shall pay unless exempted security towards estimated power consumption charges to cover three months (3MMD) power supply bills worked out on basis of the estimated consumption as per the table given below or the three months line minimum charges whichever is higher.

The estimated power supply charges shall include fixed charges, if any, for LT installations and demand charges on 100% contract demand for HT and E.H.T.installations. The fixed charges shall be as per Tariff schedule in force from time to time.

LT INSTALLATION

Type of installation

Estimated consumption per month

a) Domestic / Non-Domestic, Non Commercial lighting

10 Units for every 250 watts or part thereof of sanctioned load.

b) Non-commercial combined lighting, heating and power

100 units per KW or part thereof of sanctioned load.

c) Commercial Lighting

20 units for every 250 watts or part thereof of sanctioned load.

d) Commercial heating and/or Motive power

135 units for every KW or part thereof of sanctioned load.

e) Irrigation Pump sets

Yearly minimum charges as per Tariff in force from time to time.

f) Public lighting

As per prevailing Tariff

g) Others

135 units per KW or part thereof sanctioned load per shift.

 

HT INSTALLATION

Type of installation

Estimated consumption per month

h) All HT installations

100 units per KVA of contract demand.

 

Note: The following types of installations are exempted from payment of ISD:

    1. Water supply & Sewerage installations of Village Panchayats and Town Municipalities.
    2. Public lamp installations of Village Panchayats and town Municipalities.

 

ADDITIONAL SECURITY DEPOSIT (ASD)

After the installation is serviced, if the deposit held falls short of three times the average monthly bill amount of the preceding calendar year, the difference shall become payable by the Consumer as additional security deposit, within 30 days from the date of demand notice.

Note: The bill amount for the above purpose shall exclude taxes, arrears, audit short claims, interest, back billing charges, penal charges for excess consumption / demand.

METER SECURITY DEPOSIT (MSD)

Meter security deposit is payable towards the meter / metering equipment at the rates as per schedule of rates prescribed by the Licensee from time to time by Consumers of all LT and HT installations except:

a) All domestic lighting & Non-commercial lighting installations.

b) All commercial lighting installations whose sanctioned load is 1 KW and less.

APPLICABLE TO ALL SECURITY DEPOSITS

a)The amount payable shall be rounded off to the next multiple of Rs. 10/-

b) Security deposit (ISD and ASD) and MSD will be refunded by the Licensee on termination of the contract by either party after adjustment of dues, if any.

c) The security deposit will not earn any interest.

d) In case the ASD is not paid within the stipulated period, the installation is liable for disconnection by a 7 days notice.

COST TOWARDS SERVICE LINE FROM LT APPLICANTS(Applicable for Section 5.00 & 7.00)

i)

Upto and inclusive of 3 KW—(4HP)

NIL

ii)

Above 3 KW and upto and inclusive of 15KW

Rs.500/- per KW for the loads above 3 KW

iii)

Above 15KW and upto and inclusive of 25KW

Rs.6000/- plus Rs.1000/- for loads above 15KW.

iv)

Above 25KW

Rs.16,000/- Plus Rs.1500/- per KW for loads above 25KW.

In addition to the above charges, an additional amount of Rs.1000/- per KW for the loads above 3 KW shall be collected in Bangalore (Corporation, B.D.A., B.M.R.D.A.) area towards HT / LT U.G. cable system.

Note: In case of existing buildings, industries, wherever additional loads are to be serviced, the cost towards service line shall be collected for additional load only at the appropriate slab rate taking into consideration the existing loads also. However, the additional cost towards service line of Rs.1000/ per KW applicable for Bangalore urban area need not be collected in case of existing buildings.

COSTS TOWARDS SERVICE LINE FROM LT APPLICANTS:

(Applicable for Section 9.00)

Service line charges shall be collected based on specified load for loads above 25 KW.

For specified loads below 25 KW, Service line charges shall be collected based on requisitioned load

i)

Upto and inclusive of 3 KW.

NIL

ii)

Above 3 KW and upto and inclusive of 15KW

Rs.500/- per KW for the loads above 3 KW

iii)

Above 15KW and upto and inclusive of 25KW

Rs.6000/- plus Rs.1000/- for loads above 15KW.

iv)

Above 25KW and upto and inclusive of 50KW

Rs.16,000/- Plus Rs.5000/- per KW for loads above 25KW.

v)

Above 50KW and upto and inclusive of 100KW

Rs.1.41,000/- Plus Rs.15000/- per KW for loads above 50KW in Bangalore BMRDA & Rs.10,000/- per KW in other places

In addition to the above charges, an additional amount of Rs.1000/- per KW for the loads above 3 KW shall be collected in Bangalore (Corporation, B.D.A., B.M.R.D.A.) Area towards HT / LT U.G. cable system.

COSTS TOWARDS SERVICE LINE FOR ARRANGING POWER SUPPLY TO LAYOUT (Applicable for Section 10.00)

(Cases where the Developers / Promoters have abandoned the execution or have abstained from executing the work.)

(i) For sites coming in the areas of Bangalore Mahanagarapalike, B.D.A. and its agglomeration area, Rs.4,000/- per KW of applied load subject to a minimum of Rs.12,000/- per site.

(ii) For sites coming in the areas of city corporation and its agglomeration area of Mysore, Mangalore, Hubli, Gulbarga and Belgaum.

(a) For sites having areas of 1200 sq.ft & less, ie, (30ft x 40ft), Rs.4,000/- per KW of applied load per site subject to a minimum of Rs.4,000/- per site.

(b) For sites having areas of more than 1200 Sq.ft. Rs.4,000/- per KW of applied load subject to a minimum of Rs.12,000/- per site.

(iii) For sites coming in other urban areas within the Town limits identified by local / development authority, Rs.4,000/- per KW of applied load per site subject to a minimum of Rs.4,000/- per site. `

(iv) For sites coming beyond the Town limits in the layouts other than referred in Section10.04 (i), (ii), & (iii), Rs.3,000/- per KW of applied load per site subject to a minimum of Rs.3, 000/- per site.

SUPERVISION CHARGES - Nil as the same is adjusted towards refund of service main work as per Section 4.08 (iv)

RECONNECTION CHARGES per Installation

a) Single phase Domestic lighting Consumers. Rs.20/=
b) Single phase-Other Consumers including AEH both S.Ph / 3 Ph. Rs.50/=
c) All Consumers other than AEH connected with 3 Phase supply Rs.100/=
d) All HT & EHT installations Rs.500/=

 

Note: If the monthly bill is less than Rs100/=, RECONNECTION Fee shall be Rs. 5/= only.

TRANSFER OF INSTALLATION

a) All L.T. installations Rs.100/=per Installation
b) H.T. installation Rs.500/= per Installation

 

SERVICE CHARGES FOR ISSUE OF N.O.C. WHILE ARRANGING POWER SUPPLY TO BUILDINGS UNDER SECTION 9.00 / LAYOUTS UNDER SECTION 10.00

a) For each Building UNDER SECTION 9.00 Rs.10, 000/=per building
b) For layouts formed by private parties / societies etc. UNDER SECTION 10.00 Rs.200/=per site

or

Rs.10, 000/=per layout whichever is higher.

CHARGES FOR INSPECTION / TESTING OF INSTALLATION

a)

Inspection / Testing for servicing a new installation

(or for extension or alternation)

For the First Test No CHARGE
b)

Subsequent Inspection / testing warranted due to absence of contractor or his representative or due to defects in wiring of Consumer’s premises:

i) Domestic/Non-Commercial Lighting / Non-Commercial combined lighting & heating (AEH) / Commercial lighting installation / IP installation and Other LT installations

ii) HT installations

 

Rs.100.00

Rs.200.00

c)

Charges for service necessitated due to conversion of an installation or additions and/or alternations to an installation

i) LT

ii) HT

 

Rs.100.00

Rs.200.00

d)

Charges for temporary disconnection at Consumer’s request

Rs. 50.00

TESTING OF METERS

For testing of meter at the instance of the Consumer

(Either belonging to the Licensee or to the Consumer)

a) Domestic/Non-Commercial Lighting / Non-Commercial combined lighting & heating (AEH) / Commercial lighting installations

Rs. 100.00

b) Any Other LT installations

Rs.200.00

c) All HT installations

Rs.500.00

 

RATING / RE-RATING OF INSTALLATION

For rating / re-rating of installation at the instance of the Consumer

a) All LT installations

Rs.250.00
b) All HT installations Rs.500.00

FURNISHING CERTIFIED COPIES

(To be issued to the Consumer only)

a)

Contractor’s completion-cum-test report

Rs. 20.00

b)

Ledger Extract

Rs.20.00per Calendar year or part thereof

c) Agreement

Rs.20.00

d)

Details of Security Deposits held

Rs.50.00

e)

Estimate

Rs.50.00

f)

Any other correspondence relating to LT/HT installation

Rs.20.00 per sheet

PUBLIC LAMPS AND FITTINGS

Replacement of lamps will be carried out by the Licensee on payment of fixed labour charges, as detailed below for each lamp.

a) Incandescent lamp

Free

b) Fluorescent lamp Rs.15.00
c) Mercury vapor lamp Rs.20.00
d) Sodium vapor lamp

Note:

1) The charges indicated above do not include the cost of lamps. The local body shall supply the lamp.

2) In case of replacement of faulty chokes, starters, fittings, accessories etc., payment shall be made as per separate estimate prepared under "Deposit Contribution Works"

Rs.35.00

Charges for non-realisation of cheque is as noted below

(Cheque dishonour fee)

1

Cheque amount Upto Rs. 10,000/-

5% of amount subject to minimum of

Rs. 100/-

2

Cheque amount of Rs.10, 001 and upto

Rs.1, 00,000/-

3% of amount subject to minimum of

Rs. 500/-

3

Cheque amount Above Rs.1,00,000/-

2% of amount subject to minimum of

Rs. 3000/-

SHIFTING OF METER BOARD / METERING CUBICLE AT THE REQUEST OF THE CONSUMER

a) LT single phase supply

Rs.100.00

b) LT three phase supply

Rs.200.00

c) HT Supply

Rs.500.00

Note: The actual work shall be got carried out by the Consumer at his cost through the LEC after obtaining necessary line clear from the Licensee.

MISCELLANEOUS WORKS

The charges payable in advance for any work, which the Licensee may undertake for the Consumer and which is not included in the above schedule, shall be the cost of materials and labour plus 10% of the cost of estimate excluding the employees cost as overhead charges. Copy of the estimate shall be furnished on demand on payment of charges as per Section 30.16 (e).

<<Prev


About us    Mission Statement     New Connection    ESCOMS     Grievances   Customer Charter

Regulations    Reforms    History   Tenders    Tariff    Statistics    Policies   Important Orders  Feedback


copyrightŪ 2001-2002   All rights reserved