| POWER
FACTOR- H.T |
| POWER FACTOR- H.T |
| 1 |
It shall
be the responsibility of the HT Consumer to determine the capacity of the power factor
correction apparatus in consultation with the manufacturers/suppliers of the equipments.
- The Consumer shall
maintain an average power factor of not less than 0.85. In case this is not maintained,
surcharge shall be payable as prescribed under Tariff schedule from time to time.
- The average power
factor is the ratio of KWH to the KVAH consumed during the billing month/period.
Billing Power factor
shall be the average PF recorded in ETV meter. In case the same is not available the ratio
of KWh to KVAh consumed during the billing period and in case of non-availability of the
above also, the PF obtained during the rating shall be taken. |
| 2 |
- If during any monthly
reading or periodical or other testing / rating by the Licensee, the power factor of the
installation is found to be less than 0.85, the Consumer shall install additional power
factor correction apparatus as may be necessary to bring the power factor to not less than
0.85 within three months from the date of intimation and inform the same, in writing, to
the office of issue, failing which power factor surcharge shall be leviable as prescribed,
from the billing month following the date of expiry of the said three months, till the
P.F. is brought up to 0.85. This is also applicable for H.T. installations provided with
LT trivector meter.
- In respect of HT
installations with LT metering without LT trivector meter, if during any periodical
or other testing / rating by the Licensee, the power factor of the installation is found
to be less than 0.85, the Consumer shall install additional power factor correction
apparatus as may be necessary to bring the power factor to not less than 0.85 within three
months from the date of intimation and inform the same, in writing, to the office of
issue, failing which power factor surcharge shall be leviable as prescribed, from the
billing month following the date of expiry of the said three months, till the P.F. is
brought up to 0.85.
|
| 3 |
In the
event of meter going out of order, in any month, the power factor for the period the meter
is out of order shall be the power factor during the month previous to the month in which
the meter went out of order. |
| 4 |
Notwithstanding
the above provisions, power factor surcharge is not leviable in a HT installation for the
first three billing months from the date of service. In case the power factor continues to
be less than 0.85 even beyond the first three billing months, power factor surcharge shall
be leviable. |
|
Next>> |
|
|