ELECTRIC SUPPLY AND DISTRIBUTION CODE


 
 
line.gif (861 bytes)
Procedure applicable for Arranging power supply to Irrigation Pump Sets:
All new I.P.Sets irrespective of capacity shall be serviced WITH energy meter.

PROCEDURE

1 The application in the specified form shall be got registered at the jurisdictional Accounting Section / Sub Division Office of the Licensee on payment of registration cum processing fee as per Section 30.01.
2 The applicant shall submit along with the application "water right certificate’’ or khata certificate from the competent authority ie, Village Accountant of the Revenue Department of the concerned area, to establish his right to draw water from the water source and permanent residential address. If there is any change in permanent residential address of the applicant at a later date, the same shall be informed to the Licensee forthwith.
3 In case, the applicant desires to draw water from River / Channel / Sub-channel, Nallah, etc., by installing pump set(s), he shall furnish along with the application a ‘NO OBJECTION’ Certificate to lift water, from the concerned Irrigation Department, P.W.D. or Revenue Department as the case may be. If permission to draw water is given only for a particular period of the year, power supply will be arranged and made available only for that period subject to payment of annual minimum as per Tariff in force.
4 The feasibility criteria for arranging power supply to I.P. sets shall be as prescribed by the Licensee.
5 I.P Sets to wells dug with in 250 meters of drinking water supply bore wells of local authority should not be supplied with power without the consent of the local authority.
6 Power supply shall not be arranged to wells dug in black area as declared by department of Mines and Geology unless the entire cost of service line for arranging power supply to the I.P set is borne by the applicant.
7 General conditions of supply as per Section 4.00 wherever applicable regarding preparation of estimate, communication of power sanction, submission of completion report, wiring diagram, Agreement and payment of deposits etc., shall be complied with.
8 If the above requirements are not complied with within six months from the date of communication in case of individual Consumer and one year in the case of group estimates, the sanction of power, as well as, registration will stand cancelled and the registration fee paid will stand forfeited.
9 The Licensee reserves the right to prescribe the size, capacity, quality, efficiency and type of pump set and accessories proposed to be installed based on relevant factors namely extent of land holding, crop pattern, ground water availability, head to which the water is to be lifted, etc.
10 In the case of group estimates, the Licensee will not commence his work unless, 80% of the applicants comply with the conditions stipulated under Section 4.05 (iii) wherever applicable and the Licensee will not be responsible for the inconvenience caused on this account to the applicants who have already complied with the requirements.
11 Licensee shall execute the work of service line after fulfillment of the above conditions.
12 The Consumer shall provide suitable metal waterproof meter housing box as per Licensee’s design for fixing the 3-phase energy meter by the Licensee.

13

All IP Sets should be provided with capacitors of rating noted below depending upon the capacity of I.P.Set.
  • 5H.P. and below ---1.0 RKVA
  • 7.5H.P. ------- 2.0 RKVA
  • 10H.P ------- 3.0 RKVA
  • 15 H.P. ------- 5.0 RKVA

For IP Sets above 15HP, the rating of capacitor shall be equivalent to KW rating of I.P.Set x 0.4 RKVA rounded off to nearest integer

14 I.P set shall be energy efficient and shall bear ISI Mark.
15 In respect of IP Set installations, the initial Agreement period is 2 Years where there is only extension of service main and 7 years where there is extension of service line. If the Consumer requests for reduction of sanctioned load, the same shall be effected only after the expiry of initial Agreement period.
16  

PRIORITY:

The priority policy for taking up the I.P. Set works for execution will be as prescribed by the Licensee from time to time. However I.P.Sets sanctioned under self-financing scheme shall be given first priority over other I.P.Set applicants.

Note
The Licensee will notify the priority lists at the beginning of every month at the respective O&M unit office and also Sub-Division office.

 

Next>>


About us    Mission Statement     New Connection    ESCOMS     Grievances   Customer Charter

Regulations    Reforms    History   Tenders    Tariff    Statistics    Policies   Important Orders  Feedback


copyrightŪ 2001-2002   All rights reserved