| APPLICABLE TO L.T. POWER
SUPPLY |
| 1 |
The
prospective Consumer shall apply for temporary supply in the prescribed form to the O
& M Section / Sub-Division Office of the Licensee. No registration fee is payable. He
shall pay service charges of Rs.50/= per Installation and advance estimated power
consumption charges as per Section 12.01(c) at the prevailing Tariff rate. |
| 2 |
Licensee
shall prepare the estimate for the service line required for arranging temporary power
supply and communicate temporary power sanction indicating service charges, advance power
consumption charges, etc. |
| 3 |
Estimated
Power consumption charges Applicant shall deposit advance estimated power consumption
charges for the energy calculated at twelve units per KW per day for the duration
of temporary power supply. This will be adjusted towards periodical bills at the
prevailing Tariff rates based on the actual consumption and any balance amount at his
credit after the disconnection of temporary supply will be refunded to him on application
with in TWO months by a cheque or the same shall be adjusted to the existing permanent R.R
No. in the name of the same Consumer as requested by him in his application. If the amount
due to the Consumer is not refunded with in two months of receipt of valid refund bill,
the Licensee shall pay interest at 2% per month on actual number of days of delay on the
amount due for refund.
In
addition to the above, if the load exceeds 50KW / 67 HP the Consumer has to pay fixed
charges in addition to advance estimated power consumption charges at the
prevailing Tariff rate. |
| 4 |
On
receipt of wiring diagram and completion-cum-test report of the contractor and Agreement
in the prescribed form and copies of permit / licence / NOC, etc., Work order for
temporary supply shall be issued by the Licensee. Note:
Permit
/ Licence / NOC is not required for floor polishing,Water pumping, marriages and domestic
functions.
Approval
of the Electrical Inspectorate is required for temporary electrical installations where
100 or more people are likely to gather or assemble in a single place.
|
| 5 |
The
applicant shall arrange to execute the service line including distribution Transformer if
necessary for load of 50 KW and above and also service main work as per the
Licensees estimate and specifications on self-execution basis through a qualified
licensed electrical Contractor. The Consumer shall pay supervision charges at 10% on the
cost of estimate, subject to a minimum of Rs.100/-per work. However, the service line work
shall be commenced only after orders sanctioning the temporary supply is issued by the
Licensee. The Consumer shall provide current limiter of appropriate capacity and earth
leakage circuit breaker of adequate capacity and capacitors, if any, as
required under Section 23.00. |
| 6 |
No free
length of service line is allowed. |
| 7 |
The
prevailing rate of temporary Tariff in force is applicable. |
| 8 |
The date
of availment of the temporary supply may be got amended by the Consumer, by applying to
the authority who has issued the power sanction before the commencement date indicated in
the order. However, any alternate date proposed shall commence within 15 days of the date
of the first order. |
| 9 |
If power
is not availed as above, the advance estimated power consumption charges paid by the
Consumer will be refunded with in two months after deducting Rs.100/- on receipt of the
valid refund bill. If the amount due to the Consumer is not refunded with in two months of
receipt of valid refund bill, the Licensee shall pay interest at 2% per month on actual
number of days of delay on the amount due for refund. |
| 10 |
In case
any permit / licence / NOC is withdrawn by the competent authority after the installation
is serviced, the installation will be disconnected forthwith and will be reconnected only
after the permit / licence / NOC is restored. Further, Licensee shall not be liable for
any damages. Reduction of any charges or refund will not be permissible on this account. |
| 11 |
The
installation will be serviced by the Engineer of the Licensee by providing a suitable
meter and assigning an R.R. No. The Engineer of the Licensee
servicing the installation shall give a service certificate to the Consumer for having
serviced the installation specifying the following: -
(1)
R.R. No. (2) Date of service (3) Sanctioned load (4) Connected load(5) Meter details (6)
Condition of seals (7) Details amount of advance estimated power consumption charges
collected (8)Name of L.E.C.& Licence No. (9) Period of sanction of temporary power
supply.
Necessary
acknowledgement for the same shall be obtained on the test report. |
| 12 |
For
further extension of the period of temporary supply, the Consumer shall apply to the
jurisdictional Engineer of the Licensee at least one week before the date of expiry of
temporary supply, duly paying the upto date power supply charges and any other arrears. |
| 13 |
Temporary
power supply to Touring Talkies may be given on the production of a "Camp Allotment
Letter" from the local District Magistrate permitting Consumer for the running of the
Touring Talkies and also certificate by Electrical Inspector. Note:
However,
power supply to touring cinemas may be continued for not more than one month after the
expiry of the licence subject to the condition that the owner does not run shows until the
licence is renewed. |