| EXTENSIONS
AND ALTERNATIONS(L.T. & HT INSTALLATIONS) |
| EXTENSIONS AND
ALTERNATIONS(L.T. INSTALLATIONS) |
| 1 |
Whenever
a Consumer desires to change the machinery within the sanctioned load he shall intimate
the details to the Licensees Engineer with contractors completion cum
test report and licence of the local authority wherever required. |
| 2 |
In case of LT installations, provided with Electronic trivector
meter and opted for Demand based Tariff, additional load may be connected to the
installation subject to M.D. recorded being limited to the sanctioned load. However, the
Consumer shall inform the Licensee the details of the additional machinery installed.
If the
M.D.recorded in the electronic trivector meter exceeds the sanctioned load penal measures
shall be applicable as per Section. 42.01(i)(a). |
| 3 |
In all
other cases, if the Consumer desires to increase the number and capacity of connected
machinery beyond the sanctioned load he shall get the additional load sanctioned and
furnish contractors completion cum test report to the Licensee whose representatives
will call and inspect the alterations and if necessary, change the meters and fuses and
alter the service line at the cost of the Consumer. Failure to give notice to the Licensee
shall render the installation liable for disconnection and action as per Section 42.01
(ii) & (iii). |
| 4 |
The
Consumer is not permitted to install additional machinery by providing alternate switch
but can make use of the provisions under Section 15.02. |
| EXTENSIONS AND ALTERNATIONS(H.T. INSTALLATIONS) |
| In
case of H.T. installation, additional apparatus / equipment shall not be connected by the
Consumer to the system unless it is approved by the Electrical Inspectorate and a copy of
such approval shall be furnished to the Licensee. |
|