ELECTRIC SUPPLY AND DISTRIBUTION CODE


 
 
line.gif (861 bytes)
EXTENSIONS AND ALTERNATIONS(L.T. & HT INSTALLATIONS)
 
EXTENSIONS AND ALTERNATIONS(L.T. INSTALLATIONS)
1 Whenever a Consumer desires to change the machinery within the sanctioned load he shall intimate the details to the Licensee’s Engineer with contractor’s completion cum test report and licence of the local authority wherever required.
2

In case of LT installations, provided with Electronic trivector meter and opted for Demand based Tariff, additional load may be connected to the installation subject to M.D. recorded being limited to the sanctioned load. However, the Consumer shall inform the Licensee the details of the additional machinery installed.

If the M.D.recorded in the electronic trivector meter exceeds the sanctioned load penal measures shall be applicable as per Section. 42.01(i)(a).

3 In all other cases, if the Consumer desires to increase the number and capacity of connected machinery beyond the sanctioned load he shall get the additional load sanctioned and furnish contractor’s completion cum test report to the Licensee whose representatives will call and inspect the alterations and if necessary, change the meters and fuses and alter the service line at the cost of the Consumer. Failure to give notice to the Licensee shall render the installation liable for disconnection and action as per Section 42.01 (ii) & (iii).
4 The Consumer is not permitted to install additional machinery by providing alternate switch but can make use of the provisions under Section 15.02.

 

EXTENSIONS AND ALTERNATIONS(H.T. INSTALLATIONS)

In case of H.T. installation, additional apparatus / equipment shall not be connected by the Consumer to the system unless it is approved by the Electrical Inspectorate and a copy of such approval shall be furnished to the Licensee.

Next>>


About us    Mission Statement     New Connection    ESCOMS     Grievances   Customer Charter

Regulations    Reforms    History   Tenders    Tariff    Statistics    Policies   Important Orders  Feedback


copyrightŪ 2001-2002   All rights reserved